Details, Fiction and site acceptance test commissioning
Initiate the boot-up course of action for engineering and operator workstations as per the manufacturer’s Recommendations. Push the INIT button on the key controller (controller acquiring indicator on controller entrance panel)The site engineering workforce really should be chargeable for commissioning and validation in the qualification activ